Step 1: Know your number before you call
Have these ready. They're what any serious supplier will ask:
- Grade (mesh) and the sieve spec if you have one
- Quantity: per load and per month, not just the first order
- Destination: city, state, ZIP (or country and port)
- Packaging: supersack with pallet, without pallet, or other
- Timing: needed-by date, and whether it's urgent
- Your price: what you pay now or what you want to pay
That last one makes some buyers nervous. It shouldn't. A supplier who knows your target can tell you yes or no in one email instead of three rounds of haggling. That's why our quote form asks for it.
Step 2: Ask for data, not adjectives
"High quality," "clean," "steel-free": all meaningless without numbers. Ask for:
- A lot sieve report by ASTM D5644
- Residual steel, fiber and moisture results
- A source statement (ASTM D5603 classifies by source as well as size)
- The spec sheet with typical vs. guaranteed values marked
See crumb rubber specs explained.
Step 3: Test a sample the way you'll use it
A 1-2 kg lab sample tells you about gradation and contamination. A single supersack tells you how the material runs in your actual equipment. For a new supplier on a big program, do both.

Step 4: Compare quotes on a delivered basis
Crumb rubber is heavy and low-value per pound, so freight is a big piece of the price. Two quotes only compare when they're both:
- Delivered to your door (or both FOB the same point)
- Same packaging (pallets cost money and add weight)
- Same grade with comparable sieve curves
- Same payment terms
Example: FOB vs delivered
Supplier A quotes FOB their plant. Supplier B quotes delivered. To compare, you need A's freight to your ZIP. A typical dry-van load of 40,000-44,000 lb spreads the freight across a lot of pounds:
- If the freight is $X per load and the load is 42,000 lb, freight per pound = X ÷ 42,000
- Add that to A's FOB price, then compare to B
We quote either way. Freight from Central Ohio is short to much of the Midwest.
Step 5: Lock the terms in writing
Your PO or supply agreement should spell out:
- Grade and guaranteed spec limits, with test methods
- Quantity, schedule and tolerance (e.g., ±1 sack per load)
- Packaging and labeling (lot ID on every sack)
- Price basis (FOB or delivered) and how long it's good
- Acceptance and rejection process
- Payment terms
Step 6: Go recurring once it works
One-off loads are fine. Recurring programs are better for both sides: you get priority allocation and steady pricing; the supplier can plan production. We hold millions of pounds of 30-minus and make about 200,000 lb a month of 10-20, so recurring programs are exactly what we're set up for.
Example: Setting up a monthly program
A molder uses 18,000 lb of 10-20 a month and 4,000 lb of 30-minus.
- Monthly total: 22,000 lb, about 11 supersacks, half a truck
- Option A: one mixed half-load a month (higher freight per lb)
- Option B: one full mixed truckload every two months (44,000 lb), lower freight per lb, needs storage for ~22 sacks
- Pick based on your floor space and cash flow
Red flags
- No sieve data, or a sieve report that never changes from lot to lot
- Mesh labels without a zero screen ("30 mesh" with material on the No. 20)
- Prices that don't say FOB or delivered
- "We can do any volume" from someone who can't say how much is on the ground
- Pressure to pay everything up front to a supplier you've never bought from
Frequently asked questions
What's the minimum order for bulk crumb rubber?
Ours is typically one supersack (~2,000 lb), but truckloads and programs get the best pricing.
How long does a quote take?
Send the details in Step 1 and you'll get a straight answer within one business day. Urgent requests get a same-day response.
Why do you ask what I'm paying now?
So we can tell you right away whether we can beat it. No games.
Do you offer credit terms?
A credit application and W-9 are available on request. See resources.
Sources: ASTM D5603-23, D5644-23.